Installation Solutions for Large Stamping Presses

Shock and vibration expertise and solutions for sensitive equipment

MXLP-type isolators with the Hydra/Level feature reduce total rigging time for installation and leveling of a 1500-ton press to 5 hours.

The built-in leveling mechanism allows for quick releveling in the event the foundation settles.

Installing and leveling a large stamping press is traditionally one of the slowest and most disruptive steps in commissioning a production line, often requiring extended rigging time during which the line generates no output.

Conventional installations also become a recurring cost over time, since foundation settlement eventually requires re-leveling, a process that is just as slow to redo as the original installation if no built-in mechanism exists.

Isolators with an integrated, quick-adjust leveling feature solve both problems: they compress the initial commissioning timeline dramatically and make future releveling a routine adjustment rather than a major project.

What we do

Related
services

From defining your needs to delivering bespoke damping solutions.

Our engineering office adapts to every request and uses advanced technologies to test, simulate, perform on-site or laboratory measurements, and size your shock and vibration control solutions.

A vibration issue?

  • Reactivity

    Quick answers to all shock and vibration problems.

  • Relevance

    Tailor-made solutions thanks to a high level of technical expertise and advanced simulation tools.

  • Reliability

    Secure supplies thanks to controlled stocks and American and French manufacturing.

  • International

    Accessibility in every region of the world.