Installation Solutions for Large Stamping Presses
Shock and vibration expertise and solutions for sensitive equipment
MXLP-type isolators with the Hydra/Level feature reduce total rigging time for installation and leveling of a 1500-ton press to 5 hours.
The built-in leveling mechanism allows for quick releveling in the event the foundation settles.
Installing and leveling a large stamping press is traditionally one of the slowest and most disruptive steps in commissioning a production line, often requiring extended rigging time during which the line generates no output.
Conventional installations also become a recurring cost over time, since foundation settlement eventually requires re-leveling, a process that is just as slow to redo as the original installation if no built-in mechanism exists.
Isolators with an integrated, quick-adjust leveling feature solve both problems: they compress the initial commissioning timeline dramatically and make future releveling a routine adjustment rather than a major project.